2024 Construction Sector Dynamics in Turkey: Economic Advancements and Vulnerabilities Journal of Construction in Developing Countries |
2019 Financial Issues in Construction Companies: Bibliometric Analysis and Trends Canadian Journal of Civil Engineering |
2018 The Third Bosphorus Bridge and the Northern Marmara Motorway Project International Journal of Transport Development and Integration |
2017 Optimized real options-based approach for government guarantees in PPP toll road projects Construction Management and Economics |
Uluslararası Tam metin bildiri 22.11.2022 The Turkish Construction Sector from a Macroeconomic Perspective / The 7th International Project and Construction Management Conferance (IPCMC) |
Uluslararası Tam metin bildiri 16.11.2018 A model to assess government guarantees in BOT toll road projects using optimized real options approach / The 5th International Project and Construction Management Conference (IPCMC) |
Uluslararası Tam metin bildiri 16.11.2018 Assessment of Migrant Labour in Construction / The 5th International Project and Construction Management Conference (IPCMC) |
Uluslararası Financing and Organization of Mega Projects: Case Studies Part 2 / Innovative Governance of Large Urban Systems (IGLUS) |
Uluslararası Tam metin bildiri 10.01.2017 Earthquake Preparednes: Evaluation of Urban Transformation Law in Turkey / 16th World Conference on Earthquake Engineering |
Uluslararası Tam metin bildiri 06.09.2017 The Third Bosphorus Bridge and the Northern Marmara Motorway Project / 23rd International Conference on Urban Transport and the Environment |
Ulusal Tam metin bildiri 04.12.2016 Proje Değerlendirmesi ve Karar Verme Süreçlerinde Reel Opsiyonların Kullanımı / 4. Proje ve Yapım Yönetimi Kongresi |
2018 Transport and the City , Bilimsel Kitap , Bölüm(ler),The Third Bridge and the Northern Marmara Motorway BÜYÜKYORAN FARUK,GÜNDEŞ KADRİYE SELİN WIT Press,Ricci, S. Brebbia, C.A. 978-1-78466-317-9 Erişim Linki |
2017 Erdek Yukarıyapıcı Mahallesi Yenileme Projesi 3: Mimari Röleve Çalışmaları , Araştırma (Tez Hariç) Kitabı , Bölüm(ler),G01-Birinci Çalışma Grubu BÜYÜKYORAN FARUK Mimar Sinan Güzel Sanatlar Üniversitesi Yayınları,Çiğdem Tekin, Sema Ergönül 978-605-5005-64-1 |
2017 Erdek/Yukarıyapıcı Mahallesi Yenileme Projesi 2: Mimari Analiz Çalışmaları , Araştırma (Tez Hariç) Kitabı , Bölüm(ler),İklimsel Performans: Kırsal Yerleşim Yapılarının Enerji ve Gunışığı Performans Analizi BEYAZTAŞ HALİT,BÜYÜKYORAN FARUK Mimar Sinan Güzel Sanatlar Üniversitesi Yayınları,Selin Gündeş, Papatya Seçkin 978-605-5005-64-1 |